3 posts :: Page 1 of 1
By: Likes:
  (Read 3659 times)  

The Red Shift has been painted (walls done Thursday night) and is in somewhat of a disarray, as we wanted to let the paint dry before moving things back. FYI, the library book case is bolted to the I-beams on the floor and attached to the wall. Obviously, it didn't get moved.

There wasn't enough paint to do two coats on the walls, but it looks much more cheery and taken care of already. Maybe we'll do a second coat in the springtime. (Or whenever the lathe goes bye-bye and the wall gets built.)

I plan on being up at SM tomorrow morning, but if anyone arrives before me, feel free to shove the stuff back against the walls.

The ceiling was done last week and is ready for a sprinkling of glow in the dark stars to finish up our immediate improvement plans. Big Grin

Melody

By: Likes:
   

Nice work Melody, I'll be up tomorrow also. Would you like to move the big refrigerator into place?

Bill

   
Active Member
Registered: 06/02/09
Posts: 261
Location: Pen Argyl, PA
By: Likes:
   

Melody,
The color scheme looks fantastic! Nice and cheery. Great job. Thanks.

Kathy & Bob Weiss

3 posts :: Page 1 of 1